The storm took out three lines. Protection did its job
converter
machine
power station
industrial site
city district
region
synchronous area
On the afternoon of 28 Sep 2016, South Australia was drawing 1,826 MW of demand. By the operator's own accounting, about 77 % of it was met by wind and by imports over a single AC interconnector to Victoria.[6]
Two tornadoes damage three 275 kV lines; faults cleared by protection as designed. Nothing in this first stage was abnormal. Each fault was cleared in about 100 ms, which is what transmission protection is designed to do.
The map on the right is a constructed screening view of the grid at that operating point. Its height, Ψ, combines mechanism indicators; crossing 1 is not proof that equipment trips. At this stage the model places the event at Ψ 0.39.
- T+0.0 sSix 275 kV faults in 88 sreportTransmission towers collapse; line protection clears each fault—Ψ 0.39
- T+0.4 sWind farms reduce 456 MWreport−456 MWΨ 0.33
- T+6.9 sHeywood trips on loss of synchronismderived−420 MWΨ 2.07
- T+7.3 sIsland frequency collapsesreport—Ψ 1.03
Source: AEMO 2017. Ψ is the model's vulnerability at each stage's time scale and extent. Losses are the report's; badges mark report, derived or estimated figures.
Operating point: (wind 883 MW + Heywood import 525 MW) / SA demand 1,826 MW, from the report's pre-event balance. Project EnergyConnect did not exist in 2016, so SA's only AC path to the NEM was Heywood.